LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2019 >> Cayenne S >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 30 (2X Petrol, Exhaust, Engine-Electric - General E-Hybrid -- 9YA - Cayenne (9YA)) >> WM, 2X00IN Insulation Fault Finding >> Measurements >> Measurement 2

Measurement 2

WARNING: This page is about a different variant/trim than selected.
WARNING: Incorrect handling of high-voltage components 
  • Electric shock 
  • Short circuit 
  • Fire 
  • Explosion 

    → Only appropriately trained and authorized persons are permitted to work on high-voltage vehicles and components.

    → Required qualification: High voltage technician or high voltage expert.

    → Observe national requirements and legislation for this work.

    → Always use insulated tools, e.g. > VAS 6883 - Insulated Tool Set  when working on these components.

    → Observe general warning notes for working on the high-voltage system.

    > 2X00IN GENERAL WARNING NOTES FOR WORKING ON THE HIGH-VOLTAGE SYSTEM 

Preliminary work for measurement 2 

(High-voltage line from E-box to high-voltage charger)

  1. Release and disconnect high-voltage line (E-box - high-voltage charger) at the high-voltage charger.
    G15257879Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    E-box connection at high-voltage charger

  2. Connect high-voltage test adapter > VAS 6558/9-7 - High-voltage test adapter HVR 40  to high-voltage line (E-box - high-voltage charger). Leave the second connection open.
    G15257880Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Measurement 2

  3. Perform measurement 2.
    1. 3.1 Setpoint value > 550 MOhm 
  4. Evaluate measured result. 
    1. 4.1 If the measured value is within  the tolerance range, continue with measurement 3 
    2. 4.2 If the measured value is outside  of the tolerance range, replace high-voltage line.

      After replacing the high-voltage line, repeat measurement 1.