Installing Change-Over Valve For Low-Temperature System (UVW 2)
WARNING: This page is about a different variant/trim than selected.
- Install change-over valve for low-temperature system -1-
.
Change-over valve for low-temperature system (UVW 2)
- 1.1 Position change-over valve for low-temperature system -1- .
- 1.2 Fit and tighten nuts -5- .
- 1.3 Connect and lock cable plug -4- .
- 1.4 Push on coolant hoses -3- and tighten spring band clamps -2- using > VAS 6890 - spring band clamp pliers .
- Install coolant reservoir holder -1- .
Coolant reservoir holder (UVW 2)
- 2.1 Position coolant reservoir holder -1- .
- 2.2 Fit and tighten screws -2- .