LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2019 >> Cayenne S >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 29 (19 Engine - Cooling E-Hybrid -- 9YA - Cayenne (9YA)) >> WM, 196919 Removing And Installing Control Valve (V6 Turbo) >> Installing Control Valve

Installing Control Valve

WARNING: This page is about a different variant/trim than selected.
  1. Installation is performed in reverse order.
    1. 1.1 Tightening torque for control valve: > Tightening torque 9 Nm (6.5 ftlb.) 
    2. 1.2 Tightening torque for coolant line: > Tightening torque 9 Nm (6.5 ftlb.)