LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2019 >> Cayenne S >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 29 (19 Engine - Cooling E-Hybrid -- 9YA - Cayenne (9YA)) >> WM, 193817 Draining And Filling Coolant (High-Temperature Cooling System) >> Subsequent Work

Subsequent Work

WARNING: This page is about a different variant/trim than selected.
  1. Connect the battery/vehicle electrical system.

    > 270619 REMOVING AND INSTALLING VEHICLE ELECTRICAL SYSTEM BATTERY

  2. Bleed the cooling system.

    > Refer to WM, 190107 BLEEDING THE COOLING SYSTEM (LOW-TEMPERATURE COOLING SYSTEM)  / WM, 190107 BLEEDING THE COOLING SYSTEM (HIGH-TEMPERATURE COOLING SYSTEM) 

  3. Install cover for front underbody.

    > Refer to the appropriate service information.

  4. Test-drive the vehicle, check the coolant level in the reservoir after the cooling system has cooled down again and, if necessary, fill up to the Max marking with coolant.