Installing Pressure Pipe
Installation is performed in reverse order. Pay particular attention to the following:
Pressure pipe (at the top between the charge-air coolers):
Tighten screw-type clamps on pressure pipe.
> Tightening torque 5.5 Nm (4 ftlb.)
Tighten screws for pressure pipe.
> Tightening torque 8 Nm (6 ftlb.)
Pressure pipe (at the bottom between the charge-air coolers):
Tighten screw-type clamps on pressure pipe.
> Tightening torque 5.5 Nm (4 ftlb.)
Tighten screws for pressure pipe.
> Tightening torque 8 Nm (6 ftlb.)
Pressure pipe (at the turbocharger):
Check O-ring and replace if damaged.
Tighten screws on turbocharger flange.
> Tightening torque 8 Nm (6 ftlb.)
Tighten screws on charge-air cooler flange.
> Tightening torque 8 Nm (6 ftlb.)
Tighten screw securing pressure pipe to engine.
> Tightening torque 8 Nm (6 ftlb.)