Installing Line For ATF Cooling
WARNING: This page is about a different variant/trim than selected.
Information
- Aluminium screws must always be replaced.
- Aluminium screws must be secured using the yield-strength procedure.
- To ensure that the screws are tightened uniformly, the specified tightening setting "light, medium or hard" must be used.
- The threshold torque (initial tightening) must be set on the > 9768 - electronic torque wrench from 2 - 100 Nm (1.5 - 74 ftlb.) when tightening using the yield-strength procedure.
- Check sealing rings and replace them if necessary.
- Installation is performed in reverse order to removal.
Fastening screws securing lines to ATF cooler > Initial tightening + yield strength 2.4 Nm (2 ftlb.) .