Installing Intake-Air Distributor
WARNING: This page is about a different variant/trim than selected.
Information
Make sure not to damage the centring pins -1 - on the intake-air distributor.
- Installation is performed in reverse order to removal.
Fastening screws securing intake-air distributor to cylinder head - bank 1-2 > Tightening torque 13 Nm (9.5 ftlb.) .
Fastening screws securing intake-air distributor to cylinder head - bank 3-4 >.
Fastening screws securing connection holder to intake-air distributor >.
Fastening screw securing charge-air cooler holder to engine, M6 x 60 > Tightening torque 10 Nm .
Fastening screws securing charge-air cooler holder to engine, M6 x 30 > Tightening torque 10 Nm .
Fastening screws for holder for boost pressure control cycle valve, left section >