LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2019 >> 718 Boxster Base, Automatic DCT Trans >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 20 (40 Wheel Suspension Front Drive Shaft 2.5L -- 982 - BOXSTER/CAYMAN) >> WM, 405019 Removing And Installing Front Wheel Bearing Housing >> Technical Values

Technical Values

WARNING: This page is about a different variant/trim than selected.
Location Description Type Basic value Tolerance 1 Tolerance 2
Wheel hub on wheel bearing housing (clamping bolt) Replace lock-nut (M22 x 1.5) after every removal Tightening torque 460 Nm (339.3 ftlb.)    
Lower trailing arm to wheel bearing housing Lock nut, M12 x 1.5 Tightening torque 85 Nm (63 ftlb.)    
Spring strut mount to body Hexagon nut (M8) Tightening torque 33 Nm (24.3 ftlb.)    
Connecting link to spring strut (shock-absorber pipe clamp) M12x 1.5 thread Tightening torque 85 Nm (63 ftlb.)    
Connecting link to anti-roll bar Collar nut, M10x 1.5/always use new collar nut following removal Initial tightening 40 Nm (30 ftlb.)    
Connecting link to anti-roll bar Collar nut, M10x 1.5/always use new collar nut following removal Final tightening + 30°    
Tie-rod end to wheel bearing housing (on steering arm) Hexagon nut, M12x 1.5 Tightening torque 85 Nm (63 ftlb.)    
G14947807Courtesy of PORSCHE CARS NORTH AMERICA, INC.

Tie-rod ball on wheel bearing housing