LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2019 >> 718 Boxster Base, Automatic DCT Trans >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 2 (10 Engine - Crankcase, Suspension 2.5L -- 982 - BOXSTER/CAYMAN) >> WM, 105219 - Removing And Installing Positive Crankcase Ventilation Line >> Removing Positive Crankcase Ventilation Line >> Removing Positive Crankcase Ventilation Line (Short Section)

Removing Positive Crankcase Ventilation Line (Short Section)

WARNING: This page is about a different variant/trim than selected.
G14944494Courtesy of PORSCHE CARS NORTH AMERICA, INC.

Installation positions of positive crankcase ventilation lines

  1. Positive crankcase ventilation line, long section
  2. Positive crankcase ventilation line, short section
  3. Oil separator
  1. Release and disconnect electric plug connection -1-  .
  2. Unscrew fastening screws -2-  .
  3. Set solenoid valve -3-  with vacuum lines connected aside.
  4. Release and disconnect electric plug connection -4-  .
  5. Unclip electric line -5-  and move it aside.
    G14944495Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Removing solenoid valve

  6. Release plug-in couplings -7 and 8-  using a suitable tool and pull them off.
  7. Remove short section -6-  of positive crankcase ventilation line.
    G14944496Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Removing short section, shown on removed engine