LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2019 >> 718 Boxster Base, Automatic DCT Trans >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 2 (10 Engine - Crankcase, Suspension 2.5L -- 982 - BOXSTER/CAYMAN) >> WM, 103019 - Removing And Installing Engine Carrier (Bracket) >> Preliminary Work

Preliminary Work

WARNING: This page is about a different variant/trim than selected.
  1. Remove engine compartment lid.

    > WM, 557819 REMOVING AND INSTALLING ENGINE COMPARTMENT LID

  2. Remove air guide for raw-air intake on the air cleaner housing -1-  .
    1. 2.1 Carefully pull safety clips and remove air guide -2-  by moving it to the side.
    G14944482Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Air guide for air cleaner housing

  3. Remove underbody cover.

    > WM, 519419 REMOVING AND INSTALLING COVER FOR REAR UNDERBODY

  4. Remove diagonal braces.

    > 421320 REMOVING AND INSTALLING STRUTS .

    Preliminary work for cylinder bank 1-2: 

  5. Remove catalytic converter with cross tube.

    > 267319 REMOVING AND INSTALLING CATALYTIC CONVERTER .

    Preliminary work for cylinder bank 3-4: 

  6. Remove vacuum line -1-  for brake booster.
    1. 6.1 Press locking rings -2-  and pull off the line.
    G14944483Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Brake booster line, plug connection for oxygen sensor

  7. Loosen engine ground strap -1-  on the body -2-  .
    G14944484Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Engine ground strap