LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2019 >> 718 Boxster Base, Automatic DCT Trans >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 18 (15 Engine - Cylinder Head, Valve Drive 2.5L -- 982 - BOXSTER/CAYMAN) >> WM, 158219 - Remove And Install The Cylinder Head Cover >> Install The Cylinder Head Cover >> Installing Cylinder Head Cover (Bank 1-2)

Installing Cylinder Head Cover (Bank 1-2)

WARNING: This page is about a different variant/trim than selected.
  1. Install cylinder head cover with seal.

    Carefully guide the cylinder head cover past the fuel line! 

  2. Fit screws on the cylinder head cover evenly and tighten according to the tightening sequence -steps 1 to 11-  .

    > Tightening torque 13 Nm (9.5 ftlb.) 

    Fig 1: Cylinder Head Cover Screws Tightening Sequence - Cylinder 1-2
    G14944756Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Tightening sequence for cylinder head cover, cylinder 1-2

  3. Connect cable plugs for actuators.
  4. Install holder for control valves.
    1. 4.1 Secure the holder with screws.

      > Tightening torque 13 Nm (9.5 ftlb.) 

  5. Fit accessories and cable plugs.
    1. 5.1 Tighten screw for ground cable (ignition coils).

      > Tightening torque 10 Nm (7.5 ftlb.) 

  6. Install engine carrier bracket, bank 1-2.
    1. 6.1 Tighten M8 screws.

      Screw, M8 x 125: > Tightening torque 33 Nm (24 ftlb.) 

      Screw, M8 x 110: > Tightening torque 33 Nm (24 ftlb.) 

      Screw, M8 x 45: > Tightening torque 33 Nm (24 ftlb.) 

      Screw, M8 x 35: > Tightening torque 33 Nm (24 ftlb.) 

  7. Install heat shield.
    1. 7.1 Tighten screws:

      > Tightening torque 10 Nm (7.5 ftlb.)