Preparing Connection Areas Of The Body For Installation
- Align the sealing surface and connections of the body.
- De-burr connection points and prepare them for welding.
Information:
- Before final assembly, make sure you fully understand all the work steps involved and carry out a trial assembly without applying adhesive .
- The bonding process can only be carried out reliably when a smooth and swift sequence of operations is guaranteed .
- Do not begin bonding work until all materials and tools necessary for later repair work are available .
- Prepare marked areas for welding and bonding. Refer to WM 5X00IN WORKING WITH BODY STRUCTURAL ADHESIVE 000.043.206.30
, WM 5X00IN WORKING WITH BODY STRUCTURAL ADHESIVE PAH.071.781.00
..
Preparing connection areas of the body
Orange Bonding + resistance spot-welding Green Resistance spot-welding Blue Bonding