Installing Pdcc Control Unit
- Installation is performed in reverse order. Pay particular attention to the following:
Information
Before connecting the 48 V connectors, check whether the sealing ring -1- is positioned under the locking lugs -2- in the connectors.
Carefully press the sealing ring back over the locking lugs if necessary.
Correct position of sealing ring
Information
Observe specified sequence for connecting the electric plug connections.
Sequence corresponds to the numbers -1- to -5- .
Sequence for connecting electric plug connections
Tightening torque for screws securing front PDCC control unit to holder: >Tightening torque 5.6 Nm (4 ftlb.)
Tightening torque for plastic nut securing front PDCC control unit holder to body: >Tightening torque 2.5 Nm (1.75 ftlb.)
Tightening torque for nut securing front PDCC control unit holder to adapter holder: >Tightening torque 8 Nm (6 ftlb.)
Tightening torque for screw securing front PDCC control unit holder to body: >Tightening torque 8 Nm (6 ftlb.)
Tightening torque for ground lines on front PDCC control unit: >Tightening torque 5.6 Nm (4 ftlb.)
Tightening torque for screws securing rear PDCC control unit to holder: >Tightening torque 5.6 Nm (4 ftlb.)
Tightening torque for screws for rear PDCC control unit holder: >Tightening torque 8 Nm (6 ftlb.)
Tightening torque for ground lines on rear PDCC control unit: >Tightening torque 5.6 Nm (4 ftlb.)