LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2017 >> Panamera Base >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 26 (40 Wheel Suspension Front Drive Shaft 2.9L Turbo Hybrid -- 971 - PANAMERA (971)) >> WM, 400619 Removing And Installing The Front Axle Carrier >> Technical Values

Technical Values

WARNING: This page is about a different variant/trim than selected.
Location Description Type Basic value Tolerance Tolerance
Fastening screws securing highvoltage line to power electronics -2- Tightening torque 8 Nm (6 ftlb.)    
G15858860Courtesy of PORSCHE CARS NORTH AMERICA, INC.

High-voltage line from power electronics to high-voltage battery at power electronics
Fastening screw for ground line for power electronics, top Item 3 Tightening torque 20 Nm (15 ftlb.)    
G15858861Courtesy of PORSCHE CARS NORTH AMERICA, INC.

Ground line for power electronics, top
Fastening nut for positive cable for power electronics, bottom Item 3 Tightening torque 20 Nm (15 ftlb.)    
G15858862Courtesy of PORSCHE CARS NORTH AMERICA, INC.

Ground line for power electronics, bottom
Front axle carrier to body front M12 x 1.5 x 90 thread/always replace bolts following removal. Initial tightening 70 Nm (51.6 ftlb.)    
Front axle carrier to body front M12 x 1.5 x 90 thread/always replace bolts following removal. Final tightening + 180°    
Front axle carrier to rear body Hexagonhead bolt, M10 x 45 Tightening torque 50 Nm (36.9 ftlb.)    
Mounting anti-roll bar to body M12 x 1.5 x 90 thread/always replace bolts following removal. Initial tightening 70 Nm (51.6 ftlb.)    
Mounting anti-roll bar to body M12 x 1.5 x 90 thread/always replace bolts following removal. Final tightening + 180°    
Strut with mounting anti-roll bar to body M12 x 1.5 x 90 thread/always replace bolts following removal. Initial tightening 70 Nm (51.6 ftlb.)    
Strut with mounting anti-roll bar to body M12 x 1.5 x 90 thread/always replace bolts following removal. Final tightening + 180°    
Strut to body Hexagonhead bolt, M10 x 25/always replace bolts following removal. Initial tightening 50 Nm (36.9 ftlb.)    
Strut to body Hexagonhead bolt, M10 x 25/always replace bolts following removal. Final tightening + 45°    
Steering column centre to power-steering gear (universal joint) Hexagon roundhead bolt, M8 x 30/always replace bolt following removal! Initial tightening 20 Nm (15 ftlb.)    
Steering column centre to power-steering gear (universal joint) Hexagon roundhead bolt, M8 x 30/always replace bolt following removal! Final tightening torque angle + 90°    
Ground line to front PDCC (EAWS) control unit Item 1: Internal hexagon roundhead bolt, M5 Tightening torque 5.6 Nm (4 ftlb.)    
G15858863Courtesy of PORSCHE CARS NORTH AMERICA, INC.

Disconnecting ground lines
Fastening screws securing engine mount to bracket M10 x 45 Tightening torque 55 Nm (41 ftlb.)    
Fastening screw securing engine mount to front axle M12 x 60 x 1.5 Initial tightening 70 Nm (52 ftlb.)    
Fastening screw securing engine mount to front axle M12 x 60 x 1.5 Final tightening + 90°    
Screw-type clamp for pressure hose   Tightening torque 5.5 Nm (4 ftlb.) +/- 0.5 Nm (0.3 ftlb.)