Subsequent Work
WARNING: This page is about a different variant/trim than selected.
- Remove all test tools.
- Connect supply line -1-
.
Supply line - engine compartment connection point (shown on the Macan as an example)
- 2.1 Connect connection point for supply line -1- .
- 2.2 Fasten spring band clamp -2- using > VAS 6890 - spring band clamp pliers .
- Connect vehicle electrical system battery.
- Install engine cover (design cover).
> 108319 REMOVING AND INSTALLING ENGINE COVER (DESIGN COVER)