Installing B-Pillar
Information
- Before final assembly, make sure you fully understand all the work steps involved and carry out a trial assembly without applying adhesive .
- The bonding process can only be carried out reliably when a smooth and swift sequence of operations is guaranteed .
- Do not begin bonding work until all materials and tools necessary for later repair work are available .
- Install outer B-pillar and check that it fits perfectly. Check gap dimensions. → WM 5X00IN GAP DIMENSIONS
Information
Adhesive must not be applied to areas to be plug-welded or fully welded using inert gas.
- 1.1. Apply adhesive to the areas marked in yellow. → 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE
→ Application depth: 3.0 mm
- 1.1. Apply adhesive to the areas marked in yellow. → 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE
→ Application depth: 3.0 mm
- Resistance spot-weld the B-pillar.
- Apply a full weld to area using inert gas.