LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2017 >> 718 Boxster Base, Automatic DCT Trans >> Repair and Diagnosis >> Engine Mechanical >> Blowers, Superchargers & Turbochargers >> 21 Exhaust Gas Turbocharging 2.0L -- 982 - BOXSTER/CAYMAN >> WM, 213519 - Removing And Installing Coolant Line >> Preliminary Work

Preliminary Work

  1. Remove charge-air cooler holder.

    214219 REMOVING AND INSTALLING CHARGE-AIR COOLER HOLDER 

  2. Remove pressure pipe.

    214119 REMOVING AND INSTALLING PRESSURE PIPE 

  3. Lower the engine.

    > 1001IN LOWERING THE ENGINE TO COMPLETE OTHER WORK

  4. Remove oil tank for turbocharger.

    217519 REMOVING AND INSTALLING OIL TANK