Preliminary Work
- Secure engine on assembly support. → 1001IN SECURING ENGINE ON ASSEMBLY SUPPORT (MOUNTING BRACKET)
- Remove turbocharger. → 213019 REMOVING AND INSTALLING TURBOCHARGER
- Remove upper part of oil pan. → 175019 REMOVING AND INSTALLING OIL GUIDE HOUSING
- Remove intake-air distributor. → 244619 REMOVING AND INSTALLING INTAKE-AIR DISTRIBUTOR
- Remove camshafts. → 150520 REMOVING AND INSTALLING CAMSHAFTS
- Remove timing-case cover. → 153319 REMOVING AND INSTALLING TIMING-CASE COVER
- Remove timing chain. → 153519 REMOVING AND INSTALLING TIMING CHAIN
- Remove deflector rail and tensioning rail on the cylinder head. → 154719 REMOVING AND INSTALLING GUIDE AND TENSIONING RAILS
- Loosen fuel connection line on the fuel collection pipe.→ 243019 REMOVING AND INSTALLING FUEL DISTRIBUTOR PIPE
- Disconnect electric connector -1- on the high-pressure sensor.
- Disconnect electric plug connections.
- 11.1. Outlet hall sender -1- and intake hall sender -4-
- 11.2. Hydraulic valve for valve lift adjustment -2-
- 11.3. ONLY BANK 1cyl. 1-3: Coolant temperature sensor -3-
- Disconnect coolant vent line -1-
on the relevant cylinder head.
- 12.1. Unscrew screw -2- and pull off line.
- Remove crankcase vent line -1-
.
- 13.1. Unscrew screw -2- .
- 13.2. Pull line out of the crankcase and remove line.
- Loosen secondary-air line at the cylinder head.
- 14.1. Unscrew screws -4- .
- 14.2. Remove seal -5- .