Installing Coolant Reservoir
The coolant reservoir is installed in reverse order.
- Slide the reservoir towards the rear and into the guide.
- Fit connections and reservoir screws.
- 2.1. Fit fastening screw. → Tightening torque: 3 Nm (2 ftlb.)
- 2.2. Fit vent line.
- 2.3. Fit coolant hose.
- 2.4. Plug in connector for the water level sensor.