Preliminary Work
- If a new control unit has to be installed, the values/coding must be read out using the 2nd generation PIWIS Tester 9818 prior to removing the "old" DME control unit. → Reading And Writing Values
- Remove the two air vents at the PCM display and operator control unit.→ REMOVING CENTRE AIR VENT