Re-programming instrument cluster
Before doing any other work, read out the instrument cluster software version using the PIWIS Tester:
- Highlight the instrument cluster in the 'control unit overview '.
- Read off the version shown in the "Software version
" line in the "Extended identifications
" menu:
If the existing software version is either 0579 or 0585
→ carry out the remedial action procedure described below, starting from Step 3 (Reprogramming instrument cluster).
- Re-program
the instrument cluster
using the PIWIS Tester with test software version 16.000 installed:
- 3.1. Carry out general preliminary work for control unit programming as described in → 9X00IN BASIC INSTRUCTIONS AND PROCEDURE FOR CONTROL UNIT PROGRAMMING USING THE PIWIS TESTER - "PRELIMINARY WORK" .
- 3.2. The basic procedure for control unit programming is described in: → 9X00IN BASIC INSTRUCTIONS AND PROCEDURE FOR CONTROL UNIT PROGRAMMING USING THE PIWIS TESTER
.
Required PIWIS Tester software version: 16.000 (or higher) Type of control unit programming: Carry out control unit programming using the 'Campaign' function in the Additional menu on the PIWIS Tester by entering a programming code. Programming code: E9K7S Programming sequence: Read and follow the information and instructions on the PIWIS Tester during the guided programming sequence.
Do not interrupt programming .Software version programmed during this campaign: 1592
When programming is complete, the software version can be read out of the instrument cluster in the → 'Extended identifications' menu using the PIWIS Tester.Procedure in the event of error messages appearing during the programming sequence: → 9X00IN BASIC INSTRUCTIONS AND PROCEDURE FOR CONTROL UNIT PROGRAMMING USING THE PIWIS TESTER - "FAULT FINDING" . Procedure in the event of abnormal termination of control unit programming: Repeat control unit programming by entering the programming code again. - 3.3. Carry out general subsequent work for control unit programming as described in → 9X00IN BASIC INSTRUCTIONS AND PROCEDURE FOR CONTROL UNIT PROGRAMMING USING THE PIWIS TESTER - "SUBSEQUENT WORK"