Installing Gateway Control Unit
Information
Always comply with the regulations for handling ESD-sensitive components!
- Assembly work may only be carried out if the mechanic is wearing the working clothes and shoes approved by Porsche .
- The new part must only be removed from the ESD (electrostatic discharge) protective packaging just before installation and at the position at which the part is to be installed .
- Never touch the electric pins and plug contacts .
- Position gateway control unit on the holder.
- Tighten fastening screws -2- . Tightening torque 1.5 Nm (1 ftlb.)
- Plug in and lock electric plug connection -a- .
- Position holder on dashboard support -arrow A- and tighten fastening screws -1- . Tightening torque 6 Nm (4.5 ftlb.)