Preparing Mounting Unit (Drive Mechanism) For Installation
WARNING: This page does not describe the selected car, but rather 9 other vehicles, including the 2013 Porsche 911, 2012 Porsche 911, 2011 Porsche 911, 2010 Porsche 911, and 2009 Porsche 911. However, it is still accessible from the selected car via links, so may be relevant.
Information
To ensure the functioning of the drive mechanism, the replacement parts included in the scope of delivery must always be replaced.
- Assemble front mount.
Information
The bigger collar -arrow- on the sliding pad must always face upwards.
- 1.1. Insert sliding pad -2- into the mounting plate -1- .
- 1.2. Insert front mount slide -3-
into the sliding pad -2-
.
Information
Make sure that the drive shaft runs below the mount slide.
- 1.3. Insert drive shaft connection -4- into the front mount slide -3- in -direction of arrow- .
- Assemble rear mount.
Information
Make sure that the drive shaft runs below the mount slide.
- 2.1. Insert front drive shaft connection -2A-
into the rear mount slide -1-
in -direction of arrow-
.
Information
The clamp jaw is a safety component, which blocks the frame for the sliding roof cover when the drive shaft connections are broken.
- 2.2. Insert rear drive shaft connection -2B- between the clamp jaw -3- in -direction of arrow- .
- 2.1. Insert front drive shaft connection -2A-
into the rear mount slide -1-
in -direction of arrow-
.