Subsequent Work
- Bleed the cooling system by starting the engine and letting it warm up.
- 1.1. Open the bleeder valve on the coolant reservoir and allow the engine to warm up (coolant temperature: approx. 80 - 90° Celsius).
- 1.2. Let the engine cool down sufficiently and check the coolant level in the reservoir (recommended level: almost at maximum).
- 1.3. Correct the coolant level if necessary.
- 1.4. Close the bleeder valve on the coolant reservoir again.
- Visually check coolant line connections and hoses for leaks.
- Install engine guard holder.
- 3.1. Fit and tighten fastening screws.
Tightening torque 20 Nm (15 ftlb.)
- 3.1. Fit and tighten fastening screws.
- Install engine guard.
- Fit underbody covers.