Installing Front Anti-Roll Bar
- Place anti-roll bar and anti-roll bar mounts in installation position. Fit anti-roll bar clamps at the left and right.
- Tighten threaded connections for anti-roll bar clamps. Tightening torque 65 Nm (48 ftlb.)
- Fit the front-axle carrier. For more information see "INSTALLING FRONT-AXLE CROSS MEMBER .
- Secure connecting links to the anti-roll bar.
- 4.1. Guide ball-joint pin into the bore in the anti-roll bar.
- 4.2. Tighten new fastening nut -1-
to the specified tightening torque and torque angle. Counter with screwdriver 9546
(Torx screwdriver) at the ball-joint pin while tightening.
For vehicles without PDCC (Porsche Dynamic Chassis Control) Initial tightening 40 Nm (30 ftlb.) Final tightening +30°
For vehicles with PDCC (Porsche Dynamic Chassis Control) Initial tightening 50 Nm (37 ftlb.) Final tightening +50°