Installing Side Convertible Top Rooflining
Information
- Check that the guide cables are routed correctly at the positions shown.
Do not cross over the front guide cables -A- and -B- .
Insert guide cable -A- into the clamps -1- .
Route the side guide cable -A- behind the control arm -1- .
Route the side guide cable -A- in front of the control arm -2- and the restraining strap -3- .
Route control cable -A- at the guide eyelets as shown.
- Installation is performed in reverse order to removal.
Tightening torque 3.0 Nm (2 ftlb.)
Tightening torque 1.5 Nm (1 ftlb.)
Tightening torque 9.7 Nm (7.5 ftlb.)