Overview Diagram - Underbody Protection
Information
- In the case of repair work, the standard stone shield/undersealing of the body structure must be restored before painting or unit assembly, according to the following illustrations.
- The undersealing can onl y be applied to primed sheetmetal.
Overview diagram - underbody protection
| A | 0.2 mm to 0.4 mm |
| B | 0.5 mm to 0.7 mm |
| C | 1 mm to 1.3 mm |
| D | 0.4 mm to 0.6 mm |
Information
- In the case of repair work, the standard stone shield/undersealing of the body structure must be restored before painting or unit assembly, according to the following illustrations.
- The undersealing can only be applied to primed sheetmetal.
Overview diagram - underbody protection
| A | 0.2 mm to 0.4 mm |
| B | 0.5 mm to 0.7 mm |
| C | 1 mm to 1.3 mm |
| D | 0.4 mm to 0.6 mm |