Installing Cutoff Relay
WARNING:
Incorrect handling of safety bolts
- Danger of injury
- Loss of torque
→ Always use new fastening screws and nuts following removal.
→ Observe specified tightening torques.
→ Carry out a visual inspection of all re-used parts.
- Connect electric plug connection on the cutoff relay -A- , then slide in the latch -1- (-a- ) until it locks securely.
- First position cutoff relay -1-
, then cutoff relay -2-
.
- 2.1. Slide the eyelets of the electric lines onto the studs -A- .
- Tighten the fastening nuts -1- to secure the cutoff relays. → Tightening torque: 12 Nm (9 ftlb.)+/-1 Nm (+/-0.5 ftlb.)
- Press the cover of the power distributor onto the locking lugs -arrow- until all the locking lugs engage securely.