Mounting Transmission
WARNING: This page does not describe the selected car, but rather 9 other vehicles, including the 2013 Porsche 911, 2012 Porsche 911, 2011 Porsche 911, 2010 Porsche 911, and 2009 Porsche 911. However, it is still accessible from the selected car via links, so may be relevant.
- Attach transmission to workshop crane.
- Run in transmission.NOTE: Mechanical overload of components
- Component will be damaged irreparably
→ Observe guidelines for assembly and disassembly
Information
Always replace flange screws.
When you screw in and tighten the flange screws between the transmission and engine, the screws -1 and 2- must be screwed in and tightened last. If this is not done, the engine housing can be damaged irreparably.
- Screw in and tighten the four top fastening screws.
Location Description Type Basic value Tolerance 1 Tolerance 2 Transmission/engine connection Tightening torque 85 Nm (63 ft. lb.) - Screw in and tighten the two bottom fastening screws.
Location Description Type Basic value Tolerance 1 Tolerance 2 Transmission/engine connection Tightening torque 85 Nm (63 ft. lb.) - Fit cable duct.
Location Description Type Basic value Tolerance 1 Tolerance 2 Cable duct Fastening screws between cable duct and transmission Tightening torque 10 Nm (7.5 ft. lb.) - Engage coolant lines in holder.
- Adjust the shift and selector cables after installing the transmission. See → 341219 REMOVING AND INSTALLING SHIFT AND SELECTOR CABLES