Home >> Porsche >> 2015 >> Macan Turbo >> Repair and Diagnosis >> External Pages >> Different car >> Section 112 (2X - Petrol, Exhaust, Engine-Electronic -- PANAMERA (970)) >> WM 2X00INK5 Isolation From Supply Prior To Performing Maintenance Tasks On Hybrid Vehicles >> Isolation From Supply Prior To Performing Maintenance Tasks On Hybrid Vehicles

Isolation From Supply Prior To Performing Maintenance Tasks On Hybrid Vehicles

WARNING: This page does not describe the selected car, but rather 7 other vehicles, including the 2016 Porsche Panamera, 2015 Porsche Panamera, 2014 Porsche Panamera, 2013 Porsche Panamera, and 2012 Porsche Panamera. However, it is still accessible from the selected car via links, so may be relevant.

Specific qualifications are required for carrying out the maintenance tasks listed here.

The qualification of the person performing the task is shown in the table.

The table also shows whether or not the vehicle must be isolated from the power supply in order to perform the task.

Definition of isolating the HV system from the power supply applies to isolating the system from the power supply at the high-voltage battery (rear) and power electronics (front) 

Definition of minimum qualification: 

Eip = Electrically instructed person 

HVT = High-voltage technician 

HVE = High-voltage expert 

WM 2X00IN ISOLATING HIGH-VOLTAGE ELECTRICAL SYSTEM FROM POWER SUPPLY/STARTING HIGH-VOLTAGE ELECTRICAL SYSTEM (PANAMERA S E-HYBRID, PANAMERA S HYBRID) 

Work on the high-voltage system 

When Working On The Following Components:  Minimum Qualification: 
Isolate the high-voltage system from the power supply HVT
When working on the following components  Is the high-voltage system isolated from the power supply by the HVT before starting work?  Minimum Qualifications: 
Yes  No 
Electric machine with decoupler X(2) Eip
Power electronics X(2) Eip
Service disconnector X HVT
Rear pilot line connector X HVT
Front pilot line connector X HVT
High-voltage line from power electronics to air-conditioning compressor X(2) Eip
High-voltage line from power electronics to electric machine X(2) Eip
High-voltage line from hybrid battery to power electronics X(2) Eip
Removing and installing high-voltage battery X(1) Eip
Charging high-voltage battery X HVT
High-voltage battery control unit X(1) HVT
Fan on high-voltage battery X(1) Eip
Air extraction duct on high-voltage battery X(1) Eip
Air supply for the high-voltage battery fans X Eip
Electric air-conditioner compressor X(2) Eip
Pressure regulator for decoupler X Eip
Decoupler X(2) Eip
Pressure line for decoupler X(2) Eip
Brake fluid for decoupler X Eip
Equipotential bonding lines X Eip
Work on the coolant system of the high-voltage components X Eip
Measurement at insulation resistors X(2) HVT
(1) Use measuring box VAS 6558/1 - Hybrid Test Adapter Set to take measurements at the high-voltage battery and measuring box VAS 6558/8 - Hybrid test adapter to take measurements on the high-voltage lines with power electronics.
(2) Use measuring box VAS 6558/1 - Hybrid Test Adapter Set to take measurements at the high-voltage battery and then at the front at the power electronics.

Conventional work in the vicinity of high-voltage components 

When Working on the following components  Is the high-voltage system isolated from the power supply by the HVT before starting work?  Minimum Qualifications 
Yes  No 
Removing and installing design cover X Eip
Spark Plugs X Eip
Left catalytic converter X(1) Eip
Right catalytic converter X Eip
Exhaust system X Eip
Cardan shaft X Eip
Removing and installing engine with transmission X(2) Eip
Removing and installing engine X(2) Eip
Removing and installing transmission X(2) Eip
Auxiliary hydraulic pump for transmission oil (12 V) X Eip
Transfer Gear X Eip
Fuel Tank X(1) Eip
Front unit carrier X Eip
Rear axle housing X Eip
Underbody panelling X Eip
Welding work (covering high-voltage components and then carrying out visual inspection) X Eip
Body repair work (using straightening bench) X(2) Eip
Body repair work (assembly work and dent removal) X Eip
Working close to high-voltage components and high-voltage lines using cutting, deforming and sharp-edged tools or heat sources, such as welding, soldering, hot air and thermal bonding X(1) Eip
Removing and installing left and right headlights X Eip
Removing and installing headlight bulbs X Eip
(1) Use measuring box VAS 6558/1 - Hybrid Test Adapter Set to take measurements at the high-voltage battery and measuring box VAS 6558/8 - Hybrid test adapter to take measurements on the high-voltage lines with power electronics.
(2) Use measuring box VAS 6558/1 - Hybrid Test Adapter Set to take measurements at the high-voltage battery and then at the front at the power electronics.

General Work 

When Working on the following components  Is the high-voltage system isolated from the power supply by the HVT before starting work?  Minimum Qualifications 
Yes  No 
Removing and installing 12 volt battery X Eip
Removing and installing general control units and electric battery (12 V) X Eip
Draining and filling fluids (coolant and oils) X Eip
Removing refrigerant by suction, evacuating and filling X(1) Eip
Refrigerant line directly on air-conditioning compressor X(2) Eip
Air conditioning performance test (for checking the pressure transmitter, using air conditioning service unit) X Eip
Refrigerant line in peripheral vehicle equipment (work that is not directly on the air-conditioning compressor, without opening the refrigerant circuit, e.g. loosening and securing refrigerant lines). X Eip
Work in the engine/chassis area for which the cover plate on the power electronics must be removed. X Eip
Work in the engine area for which the cover plate must be removed and lines must be disconnected at the power electronics. X(2) HVT
Work for which the engine is raised by up to approx. 20 cm (e.g. engine mountings). X(1) Eip
Hydraulic pump for steering (12 V) X Eip
Electric vacuum pump (12 V) X Eip
Emissions inspection X Eip
(1) Use measuring box VAS 6558/1 - Hybrid Test Adapter Set to take measurements at the high-voltage battery and measuring box VAS 6558/8 - Hybrid test adapter to take measurements on the high-voltage lines with power electronics.
(2) Use measuring box VAS 6558/1 - Hybrid Test Adapter Set to take measurements at the high-voltage battery and then at the front at the power electronics.