Installing Cutoff Relay
Information
- Use new nuts!
- First position cutoff relay -4- , then cutoff relay -3- .
- Push the eyelets -2- of the electric lines onto the studs.
- Tighten the fastening nuts -3- on the cutoff relays. → Tightening torque: 8 Nm (6 ftlb.)
- Clip the (HSB) control unit in at the clips -1- .
- Plug in electric plug connections for the cutoff relays until the connectors engage securely.
- Close the cover on the power distributor (HSB) until the locking lugs engage securely.
- Slide the power distributor (HSB) into the guide -arrow C- and tighten the fastening screw -arrow D- .