Preliminary Work
With engine installed =>
- Remove high-pressure pump on cylinder bank 5 to 8.
- Pull off cable plug on solenoid valve for valve lift switchover.
- Remove vac um pump on cylinder bank 1 to 4.
- Pull off cable plug on solenoid valve for valve lift switchover.
If cylinder head is replaced =>
- Remove screw plug with sealing ring. -1-
Screw plug on secondary-air duct
1 Screw plug on secondary-air duct; if re-used: > Tightening torque 10 (7.5 ftlb.) Nm .