LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2013 >> Cayenne Turbo >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 46 (13 - Engine - Crank Drive, Pistons (4.8L Non Turbo) -- 92A - Cayenne (92A)) >> WM, 131019 Removing And Installing Pistons >> Subsequent Work

Subsequent Work

WARNING: This page is about a different variant/trim than selected.

Information 

The tightening specifications for the basic engine are stored centrally.

> TECHNICAL VALUES

/

> 2X00IN TECHNICAL VALUES

or

> WM, 1001IN TIGHTENING TORQUES, TIGHTENING SEQUENCES, ASSEMBLY OVERVIEWS FOR ENGINE

Tightening torques and assembly instructions for other assemblies (e.g. chassis, electrics, transmission or body) or for peripheral engine equipment can be found in the corresponding documents.

  1. Fit oil guide/oil plate.
    Fig 1: Oil Guide Components Location (Oil Plate)
    G16308325Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Oil guide (oil plate)

    Oil guide (oil plate)
    Oil return seal
    Screw, M6 x 20
    Bulkhead seal
    Joining socket
    O-ring
    Assembly depth until locking lug engages
    Direction of travel
  2. Install the oil pump.

    > 172019 REMOVING AND INSTALLING OIL PUMP

  3. Install cylinder heads.

    > 157019 REMOVING AND INSTALLING CYLINDER HEAD

  4. Fit timing chain.

    > WM, 153519 REMOVING AND INSTALLING TIMING CHAIN

  5. Fit timing-case cover.

    >WM, 153319 REMOVING AND INSTALLING UPPER CHAIN HOUSING COVER

  6. Fit oil pan and oil guide housing.

    > 175019 REMOVING AND INSTALLING OIL GUIDE HOUSING

  7. Fill in engine oil. For details, see > 170117 DRAINING AND FILLING ENGINE OIL (CHANGING ENGINE OIL)
  8. Remove engine from the assembly support.
  9. Refit transmission.
  10. Install the engine.

    > 100119 REMOVING AND INSTALLING ENGINE