Installing Turbocharger
Information
- Replace gaskets, sealing rings and O-rings.
- Fill the turbocharger with engine oil at the oil supply line adapter.
- Hose supports and hoses for the charge air system must be free of oil and grease before being fitted.
- Secure all hose connections with standard hose clamps.
- To fasten the charge air hoses securely to their adapters, spray the threaded parts of previously used screw-type clamps with anti-rust agent before installation.
- Refit all heat protection boots at the same position during installation.
- Let the engine run at idle speed for about 1 minute and avoid revving the engine after installing the turbocharger to ensure an adequate oil supply for the turbocharger.
Prepare and fit turbocharger
- Clean the connecting hose -1-
. The inside of the hose must be free of oil and grease.
- Slide the connecting hose -1- onto the connection piece for the turbocharger using the two hose clamps -2- .
- Fit turbocharger.
- Join lower part -5- of oil return line to upper part -3- of oil return line.
- Fit new O-ring -1- on lower part -5- of oil return line.
- Apply a light coating of oil to the O-ring and the inner sealing face on the upper part -3- of the oil return line.
- When fitting the turbocharger -4-
, guide the upper part -3-
of the oil return line through the rear connecting tube -2-
to the lower part of the oil return line.
Information
Do not damage O-rings!
- Carefully attach upper part -3- of oil return line to lower part -5- of oil return line.
- Further installation is performed in reverse order.