Subsequent Work
- Fit all-wheel final drive
> WM 398819 REMOVING AND INSTALLING FOUR-WHEEL FINAL DRIVE (PANAMERA 4, PANAMERA 4S, PANAMERA TURBO, PANAMERA 4 S EXECUTIVE, PANAMERA TURBO EXECUTIVE, PANAMERA TURBO S, PANAMERA TURBO S EXECUTIVE, PANAMERA GTS) - section on "Installing"
- Fit front-axle carrier
> WM 400619 REMOVING AND INSTALLING FRONT-AXLE CARRIER (EXCEPT PANAMERA GTS, PANAMERA TURBO S, PANAMERA PLATINUM ED., PANAMERA 4 PLATINUM ED.) - section on "Installing"
- Fit vibration balancer
> 137619 REMOVING AND INSTALLING PULLEY (VIBRATION BALANCER) - section on "Installing"
- Clip in coolant hoses on the oil/water heat exchanger -8-
.
Courtesy of PORSCHE CARS NORTH AMERICA, INC.
Coolant return on turbo engine
1 Connection piece on generator 2 Connection piece screw 3 Screw, M6 x 20 4 Coolant return line 5 Coolant return hose assembly 6 Holder 7 M6 screw - aluminum screw; always use new aluminum screws and 8 Clip - Remove engine bridge.
- Fill in engine oil. For details, see
> 170117 DRAINING AND FILLING ENGINE OIL (CHANGING ENGINE OIL)
- Connect coolant supply line to the oil/water heat exchanger. Connect the coolant hoses to the oil/water heat exchanger at the same time. Remove hose clamps.
- Check the engine coolant level and top up if necessary.
- Align the front axle and bleed all open systems.
- Carry out a check. After test-driving the vehicle, check the engine for leaks. Then check the oil level.