Subsequent Work
- Install the dashboard. → INSTALLING DASHBOARD
- Install heat exchanger supply hose. → INSTALLING HEAT EXCHANGER SUPPLY HOSE
- Install directional-control valve. → INSTALLING DIRECTIONAL-CONTROL VALVE
- Secure the refrigerant hoses at the expansion valve. → INSTALLING EXPANSION VALVE
- Install heat exchanger return hose. → INSTALLING HEAT EXCHANGER RETURN HOSE
- Fill in refrigerant. → WM 870317 DRAINING AND FILLING REFRIGERANT
- Install cross panel. → INSTALLING CROSS PANEL
- Install plenum panel cover. → INSTALLING PLENUM PANEL COVER
- Connect the battery. → 2X00IN WORK INSTRUCTIONS AFTER DISCONNECTING THE BATTERY