Filling coolant (includes bleeding)
Information
The process of filling and bleeding the cooling system is performed using the special tool filling device 9696 .
Information
- In all Cayman vehicles and in Boxster vehicles from MY 2007, the coolant expansion tank is located in the engine compartment.
- Testing and inspection work can be performed via the opening in the service tray (right).
- Filling and bleeding work are performed on the coolant expansion tank.
- Fit the vehicle protective covers.
- Protect the luggage compartment against soiling with a cover.
- Screw cap adapter for coolant expansion tank (K22) onto the tank and attach flexible extension (Fz100) to the cap.
Courtesy of PORSCHE CARS NORTH AMERICA, INC.
- Connect vacuum pressure gauge of bleeder tool to the flexible extension. When doing so, ensure that both shutoff valves are closed (positioned at 90° to flow direction).
- Connect the Venturi nozzle to the vacuum pressure gauge.
Courtesy of PORSCHE CARS NORTH AMERICA, INC.
Information
- The quantity of coolant available should exceed the amount required to fill the system by about two litres in order to prevent air being sucked in.
- An antifreeze content of -35 °C corresponds to a mixture of 50:50 (coolant:water).
- Place a canister with a sufficient amount of coolant and with an antifreeze content for -35 °C behind the vehicle near to the expansion tank
Information
- The bleeding process is completed more quickly if the canister is positioned at the same height as the coolant reservoir .
- Push the filler hose of the vacuum pressure gauge -5-
onto the canister connection. Draw off the return line -6-
of the Venturi nozzle into a second container.
Courtesy of PORSCHE CARS NORTH AMERICA, INC.
Information
- A hissing sound after connecting the compressed air supply is normal .
- Connect compressed air supply to Venturi nozzle
- Open both shutoff valves on the vacuum pressure gauge until the transparent filler hose has completely filled with coolant.
- Close left shutoff valve on the vacuum pressure gauge -arrow-
and allow a vacuum to build up in the coolant circuit.
Information
- If no vacuum is built up, there is a leak in the cooling system or the connection pressure is too low.
- Deformation of the rubber hoses in the cooling system is normal.
- When the pressure gauge pointer is in the green area of the display scale, a sufficient vacuum has been built up.
- If both shut-off valves are closed and the compressed air supply is disconnected, the vacuum must not drop.
- If the vacuum drops within approx. 30 seconds, there is a leak in the cooling system .
- When there is enough vacuum in the cooling system, close right shutoff valve and subsequently unplug the compressed air supply.
- Open left-hand shutoff valve to the vacuum pressure gauge (right-hand valve closed -arrow- ). The cooling system is then filled.
- When the cooling system no longer contains a vacuum (vacuum pressure gauge shows zero), i.e. no more coolant is being sucked out of the canister, open right-hand shutoff valve.
- Now remove the complete filling device filling device 9696 (including cap K 22).
- If necessary, fill the coolant expansion tank with coolant up to the maximum marking and screw on the cap of the expansion tank (do not tilt).