Subsequent Work
Additional scope for turbo engines:
- Install pressure and suction hoses close to cylinder 1-4 → Installing Pressure Pipes
.
- 1.1. Install the right intake pipe (direction of travel) at the bottom in front of the turbocharger.
- 1.2. Install the lower right pressure pipe (direction of travel) between the charge-air cooler and turbocharger.
- 1.3. Install pressure pipes at the top in front of the throttle valves.
All vehicles:
- Install drive-belt deflection roller.
- Install drive belt → Installing Drive Belt .
- Install air boxes for the air cleaner housing → Installing Air Box For Air Cleaner .
- Fill in coolant → Filling Coolant
.
Additional scope - V8:
- Install radiator frame → Installing Cooling Fan Housing
. On vehicles with PDCC
, clip in the lines on the front-axle carrier.
All vehicles:
- Install cover for underbody protection. → Installing Cover For Front Underbody
- Install front wheel housing liner at the right. → 505619 REMOVING AND INSTALLING FRONT WHEEL HOUSING LINER .
- Fit right front wheel → 440519 REMOVING AND INSTALLING WHEEL .
- Connect the battery → 2X00IN WORK INSTRUCTIONS AFTER DISCONNECTING THE BATTERY .