LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2011 >> 911 Speedster >> Repair and Diagnosis >> Engine Mechanical >> Cooling System (Mechanical) >> 19 - Engine - Cooling -- CARRERA (997) >> WM 194019 Removing And Installing Coolant Reservoir (Except Turbo Coupe, Turbo S Coupe, Turbo CABRIO & Turbo S CABRIO) >> Subsequent Work

Subsequent Work

  1. Raise the engine.

    Raise the engine into installation position with a jack, using Retainer Plate P 9592  to do this.

    Screw in and tighten M12 collar nuts -1-  .

    → Tightening torque: 85 Nm (63 ft. lb.) 

    Fig 1: Engine Carrier To Engine Mounting (Cylinder Bank 4-6)
    G09827710Courtesy of PORSCHE CARS NORTH AMERICA, INC.
  2. Fill in coolant and bleed the system.

    → 193817 DRAINING AND FILLING IN COOLANT (INCLUDES BLEEDING) .

  3. Install air cleaner housing.

    → 242519 REMOVING AND INSTALLING AIR CLEANER HOUSING - section on "Installing".

  4. Test-drive the vehicle and correct the engine coolant level in the reservoir if necessary (observe Min/Max marking).