Removing Side Section
1 - Side section
Y - Seal
- Determining cut
- 1.1. Position the cut L on the lower side member so that the replacement body part overlaps the lower side member by approx. 60 mm. Mark the cut.
- Cutting through the lower side member
- 2.1. Cut through the side section at the marked connection point L .
- Mill off spotwelds.
- 3.1. Mill off spotwelds in area A using a spotweld cutter.
- Mill off spotwelds.
- 4.1. Mill off spotwelds in areas B, C, D, P with a spotweld cutter.
- 4.2. Cut through the shielding gas weld in area E using the parting grinder.
- Cutting the spotwelds
- 5.1. Mill off spotwelds in areas F, G, H, I using a spotweld cutter.
- Mill off and cut through spotwelds
- 6.1. Mill off spot welds in area K using a spotweld cutter.
- 6.2. Cut through the side section at the connection point J with the parting grinder.
- Remove expanded sealant
- 7.1. The outer side section is factory sealed to the inner side section with expanded sealant Y . The expanded sealant will be destroyed when replacing the side section and must be replaced.