LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2008 >> Cayenne Base, Automatic >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> 13 - Engine - CRANKGEAR, Pistons >> WM 136019 Removing And Installing Flywheel (Dual-Mass Flywheel) On DFI Engines (Cayenne Man, Cayenne S Man, Cayenne GTS, Cayenne TRANSSYBERIA Man) >> Installing Flywheel (Dual-Mass Flywheel)

Installing Flywheel (Dual-Mass Flywheel)

Information 

  1. Clean flange and fit flywheel (align with removal marking if necessary). Fit the new fastening screws and tighten hand-tight.
  2. Block flywheel. To do this, attach toothed segment 201a  or toothed segment 9538/1  to a screw hole in the crankcase so that at least one tooth engages with the starter teeth. Place a washer (approx. 5 mm) under the segment if necessary.
    Fig 1: Identifying Toothed Segment
    G09409138Courtesy of PORSCHE CARS NORTH AMERICA, INC.
    Fig 2: Exploded View Of Clutch And Flywheel
    G09409139Courtesy of PORSCHE CARS NORTH AMERICA, INC.
  3. Tighten the new fastening screws crosswise. → Tightening torque: 60 Nm (44 ft lbs.)  → Torque angle: 90° 
    Fig 3: Tightening Flywheel Fastening Screws
    G09409140Courtesy of PORSCHE CARS NORTH AMERICA, INC.