LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2007 >> Cayman Base, Standard >> Repair and Diagnosis >> Body & Frame >> Exterior Body Panels >> 53 - Body Rear - BOXSTER & CAYMAN >> 53 61 55 Replacing Inner Side Section - As Of My 2006 (CAYMAN S, CAYMAN S RHD) >> Preparing Connection Areas Of The Body For Installing The Inner Side Section >> Preparing connection areas of the body for installing the front inner side section

Preparing connection areas of the body for installing the front inner side section

Fig 1: Cleaning the welding areas
GP00011922Courtesy of PORSCHE OF NORTH AMERICA, INC.

1. Clean undersealing, adhesive residue and paint off the body connecting flanges in the marked area -A-  using a hot-air gun or rotary brush. Grind the connecting flanges until bare. See Fig 1.

Fig 2: Cleaning the welding areas
GP00011923Courtesy of PORSCHE OF NORTH AMERICA, INC.

2. Clean undersealing, adhesive residue and paint off the body connecting flanges in the marked area -A-  using a hot-air gun or rotary brush. Grind the connecting flanges until bare. See Fig 2.

Fig 3: Cleaning the welding areas
GP00011924Courtesy of PORSCHE OF NORTH AMERICA, INC.

3. Clean undersealing, adhesive residue and paint off the body connecting flanges in the marked areas -A, B, C, D, E, F, G-  using a hot-air gun or rotary brush. Grind the connecting flanges until bare. See Fig 3.

NOTE:
  • Keep bonding areas clean and free of grease and do not coat with zinc powder paint. 

4. Coating spot-weld flange areas with zinc powder paint

4.1. Coat spot-weld flange areas with zinc powder paint.

Fig 4: Preparing bonded flanges
GP00011925Courtesy of PORSCHE OF NORTH AMERICA, INC.

5. Preparing bonded flanges

5.1. Sand down bonded flanges in the marked area -A-  from below and clean them off. See Fig 4.

See: Working with adhesive Refer to 50 IN Processing structural body adhesive - as of MY 2005 (All Models) ..

Fig 5: Priming bonded flanges
GP00011926Courtesy of PORSCHE OF NORTH AMERICA, INC.

6. Priming bonded flanges

6.1. Prime bonded flanges in the marked area -A-  from below. See Fig 5.

See Working with primer Refer to 50 IN Processing structural body adhesive - as of MY 2005 (All Models) .