Installing side section
- Danger of injury and material damage
→ Once the spare parts have been fixed in place, repair spotwelds must be placed on the old spotwelds because there is no current flow possible in areas with a hardened adhesive layer. Welding procedures other than resistance spot-welding are not permitted since the thermal effect would destroy the bonded joint over a wide area. Refer to 50 IN Processing structural body adhesive - as of MY 2005 (All Models) .
1. Installing seal
1.1. Apply a triangular bead of body sealant Y measuring dimension "X" = approx. 12 mm high all around the seal. Position seal on the inside of the side section and press firmly.
Check dimension for viewing window for inner side section → Length: X = 28 mm
2. Applying adhesive to the side section
2.1. Apply a triangular bead of adhesive - dimension "X" = approx. 8 mm - to the inside of the side section, along the wheel arch and up to the start of the sill.
- The quality of the joint will be affected if the adhesive processing time is not observed.
→ The new part must be welded within 30 minutes in the area of the adhesive, otherwise the adhesion of the adhesive will be affected.
2.2.
3. Applying adhesive to the inside of the side section
- The quality of the joint will be affected if the adhesive processing time is not observed.
→ The new part must be welded within 30 minutes in the area of the adhesive, otherwise the adhesion of the adhesive will be affected.
3.1. Apply a triangular bead of adhesive (Teromix-6700) - dimension "X" = approx. 10 mm high - to the inside of the side section.
4. Welding in the side section
4.1. Secure the rear side section with tensioning clamps. Use test gauge 9748.
4.2. Tack-weld the side section at the rear.
- The quality of the joint will be affected if the adhesive processing time is not observed.
→ The new part must be welded within 30 minutes in the area of the adhesive, otherwise the adhesion of the adhesive will be affected.
4.3. Spot-weld area A of the side section.
5. Welding in the side section
- The quality of the joint will be affected if the adhesive processing time is not observed.
→ The new part must be welded within 30 minutes in the area of the adhesive, otherwise the adhesion of the adhesive will be affected.
5.1. Spot weld areas H, F, G, I of the side section.
6. Welding in the side section
6.1. Spot weld areas B, C, D of the side section.
6.2. Weld area E of the side section using inert gas.
6.3. Plug-weld area P of the side section using inert gas.
7. Welding in the side section
7.1. Spot-weld area K of the side section.
7.2. Braze weld area J of the side section
8. Welding in the side section
8.1. Weld area L of the side section using inert gas.