Installing the three-phase generator
- Fasten B+ lead and install three-phase generator.
- The B+ lead must be fastened onto the long wiring arrangement -(arrow)- of the three-phase generator (see Fig 1 ).
- Install deflection roller and fit drive belt.
Tightening torque of the hexagon nut M16 x 1.5: 65+/- 5 Nm (48 +/- 3.5 ftlb)
Tightening torque of the hexagon-head bolts M10: 46 Nm (34 ftlb.)
Tightening torque of the M8 hexagon nut: 15 Nm (11 ftlb.)
Tightening torque of the deflection roller M10: 46 Nm (34 ftlb.)
- Install air flow sensor with air cleaner assembly and connect battery.
- Perform a function test.