Without Service Bay Test
WARNING: This page is about a different variant/trim than selected.
- Connect the J 41415-30 to the fuel tank filler neck. See Special Tools . Connect the J 41413-200 to the J 41415-30 . See Special Tools .
- Turn the nitrogen/smoke valve to nitrogen.
- Use the remote switch to introduce nitrogen and fill the EVAP system until the floating indicator stabilizes.
- Verify the flow meter's floating indicator position is stable and at or below the red flag for 5 minutes.