Installation Procedure
WARNING: This page is about a different variant/trim than selected.
- Install the 3 bolts and charcoal canister assembly.
Tighten: 19 N.m (14 lb ft)
- Connect the charcoal canister filter sub-assembly to the charcoal canister assembly.
- Connect the purge line hose.
- Connect the wire harness clamp.
- Connect the vapor pressure sensor connector.
- Connect the fuel tank vent hose to the charcoal canister.
NOTE:
Refer to Fastener Caution
.