LEMON Manuals: Even more car manuals for everyone
Home >> Pontiac >> 2008 >> Vibe Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 88 (Automatic Transmission - 6L50/6L80/6L90 - Removal & Installation, Service, Overhaul, Troubleshooting & Diagnosis) >> Off-Vehicle Repair Instructions >> Torque Converter Housing Cleaning and Inspection

Torque Converter Housing Cleaning and Inspection

WARNING: This page is about a different car, the 2008 Hummer H2. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Torque Converter Housing Cleaning and Inspection
GM1696428Courtesy of GENERAL MOTORS CORP.
Callout Component Name

Preliminary Procedures

  1. Thoroughly clean the torque converter housing assembly, including threads, with clean solvent.
  2. Clean sealing surfaces.
  3. Inspect all threaded holes. If necessary, repair any thread damage.
1 Line Pressure Test Hole Plug
2 A/Trans Vent Pipe
3 Trans Fluid Cooler Pipe Fitting Seal
NOTE: Refer to Seal Reuse Notice .

Tip:  Refer to Fluid Cooler Pipe Seal Replacement .
4 Torque Converter Bushing