Instrument Cluster Replacement (SKY)
| Callout | Component Name |
|---|---|
| Preliminary Procedure: Remove the instrument panel (I/P) upper trim panel. Refer to Instrument Panel Upper Trim Panel Replacement (SKY) . |
|
| 1 | I/P Cluster Assembly Screw (Qty: 4)
NOTE:
Refer to Fastener Notice
.
Tighten: 2 N.m (18 lb in) |
| 2 | I/P Cluster Assembly Procedure
|