Propeller Shaft Replacement (Z0K)
Courtesy of GENERAL MOTORS CORP. Propeller Shaft Replacement
| Callout |
Component Name |
|
Preliminary Procedure
- Remove the driveline tunnel closeout panel. Refer to Floor Panel Tunnel Panel Replacement -- Rear
.
- Support the rear drive module (RDM).
- Remove the bolt from the differential case bracket assembly to body.
|
| 1 |
Propeller Shaft Coupling Nuts (Qty: 3) Tip:
- DO NOT remove the bolts from the coupler to the propeller shaft. Remove only the bolts from the coupler to the drive axle pinion flange.
- Clean the threads and apply LOCTITE. Refer to Sealers, Adhesives, and Lubricants .
Tighten:
85 N.m (63 lb ft)
|
| 2 |
Propeller Shaft Coupler Bolts (Qty: 3) |
| 3 |
CV Joint Mounting Bolts (Qty: 6) Tip:
Tighten:
40 N.m (30 lb ft)
|
| 4 |
CV Joint Mounting Bolt Spacers |
| 5 |
Propeller Shaft Tip:
- Before installation, apply a small amount of lubricant to the front and rear propeller shaft center bushings. Refer to Sealers, Adhesives, and Lubricants .
- Lower the front of the RDM to remove the propeller shaft from the pinion flange.
|