Installation Procedure
WARNING: This page is about a different variant/trim than selected.
- Install the new gasket.
- Install the throttle body assembly (1).
- Install the throttle body bolts (5) and the nuts (4).
Tighten: Tighten the bolts and the nuts to 10 N.m (89 lb in).
- Connect the throttle body electrical connector.
- Install the air cleaner intake duct. Refer to Air Cleaner Inlet Duct Replacement .
- Install the fuel injector sight shield. Refer to Fuel Injector Sight Shield Replacement (L26) or Fuel Injector Sight Shield Replacement (L32) in Engine Mechanical - 3.8L.
- Fill the cooling system. Refer to Draining and Filling Cooling System (L26, L32 GE 47716 Fill) or Draining and Filling Cooling System (L26, L32 Static Fill) or Draining and Filling Cooling System (LS4 GE 47716 Fill) or Draining and Filling Cooling System (LS4 Static Fill) in Engine Cooling.
NOTE:
Refer to Fastener Notice
in Cautions and Notices.